
ELBA ISLAND LNG TERMINAL EXPANSION - TIC - The Industrial Company
Since 2001, TIC – The Industrial Company (TIC) has executed over 30 projects at the Elba Island LNG Terminal, a bidirectional plant with an export capacity of 2.5 million metric tonnes per year.
BILLY MINER CENTRAL GATHERING FACILITIES - TIC - TIC – The …
After completing both CGFs, TIC was contracted to remove and repair damaged compressor station equipment during a shutdown.
ELBA ISLAND LNG TERMINAL EXPANSION - MARINE AND HEAVY CIVIL …
Since 2001, TIC has executed over 30 projects at the Elba Island LNG Terminal, a bidirectional plant with an export capacity of 2.5 million metric tonnes per year.
Port Arthur Refinery - TIC – The Industrial Company
TIC – The Industrial Company (TIC) performed mechanical installation of two Linde designed and furnished sulfur recovery units, one being 400 long tons per day and the other 200 long tons per day.
Entergy Program - TIC – The Industrial Company
Please use the form below to express interest and request more information about working with TIC. If you’re interested in skilled craft career opportunities on our projects, please visit our career site.
Savannah Yacht Center - TIC – The Industrial Company
TIC performed the demolition and expansion of the existing slip to create a new wet slip and installed a 3,240-ton Syncrolift system. This addition established the only superyacht shiplift platform and rail …
Olefins Recovery Project - TIC – The Industrial Company
TIC – The Industrial Company (TIC) was contracted to construct the olefins portion of a world-class plastics manufacturing facility as part of Kiewit and Chiyoda International Corporation’s EPC contract …
Magnolia Power Generating Station Unit 1 - TIC - The Industrial Company
TIC – The Industrial Company was hired as part of the engineering, procurement and construction contract for the 705-megawatt, nominal rated combined-cycle gas turbine power plant.
Port Allen Export Terminal Renovation - TIC – The Industrial Company
TIC – The Industrial Company subsidiary, Ibberson, was awarded the contract to design, engineer and construct the primary materials handling systems for corn, wheat, soybeans and milo along with the …
Torrance Refinerty FCCU Electrostatic Precipitator Installation - TIC ...
TIC installed two massive electrostatic precipitators (ESPs) in the fluidized catalytic cracking unit (FCCU) of ExxonMobil’s Torrance Refinery. Covering 750 acres, the Torrance Refinery processes …